Friday, April 19, 2013

new year new plans

It's been a while since I have been here.
Tyler did move out on his own.
The model room moved into the front room, the middle room will be a display room and the back room will become a library.
I may skip going to KC this year to get ahead on building, and only go to the local shows. Next year I would like to go to Milwaukee and Kansas City.
Am also considering joining the local IPMS club.

Progress on the projects previously shown;
The tire truck has not moved.
The car hauler was considered finished, and broke in several places on the way to Kansas City.
It was repaired but did not place because it had no commercial markings or license plates.
It will return next year with full repairs and markings.

New projects include an Autocar  flatbed with a portable fuel tank, and a Diamond-Reo flatbed .
The DR will have a scratchbuilt 25 ton trailer, and an ertl backhoe.
Markings will be for the DoLittle Excavation Co.
The trucks for these are almost finished. The trailer will require resin 1 ton wheels which I would like to cast myself. I would like to  trick out the backhoe, but will see.

Finally quit the job at Sears to have more time for this, but so far laziness has taken over.
The library room would be especially useful as I intend to move the printers in there, and will have access to my magazine collection.
At present it is waiting on the bookcases, which cannot be made until the scrapbox project is finished.
The scrapbox is moving slowly because it is bigger than the work area, and hard to work on.

Monday, February 6, 2012

Progress on the model room is going slowly. I started an inventory, unfortunately,I didn't finish before new stuff arrived and the new stuff hasn't been added..
Also added a piece to each of the paint shelves and they are now much straighter and rigid..
It is possible that Tyler will move out in April,. If he does I'm going to use his room as a library and display room. this will free up space in several places. I will also be able to make use of the middle room.This is likely where the display shelves will go.
I haven't been here for a while..
In 2011 very little got done, we did go to Kansas City, and Louisville, took the International 2674 Rollback, and the DM-600 w/ low boy and transformer...took first and second in KC, but didn't place in Louisville.
Of the two trucks shown in previous posts, some progress has been made on the car hauler.
The tire truck, (other than pulling out to look at) has not been touched.
Other projects have been started, but I really should finish up these two, for this year.

Thursday, January 6, 2011

Updates

After KC, we went to Louisville and repeated the same awards, and the 26 Mack took 2nd in Heavy Commercial.
AND, got it's picture in Scale Auto's contest annual.

Since KC, I've been trying to decide what to build for 2011, which is now here...
Started on a Chevy cabover, that will need many scratchbuilt parts. Hopefully will be done in time...

Tuesday, June 15, 2010

Heartland Nationals and Horntooting

Went to KC for the Heartland Nationals this past weekend.
Haven't done contests in 20 years. Took the Autocar and cat, the railtruck, and the 26 Mack.
To my surprise and delight, the autocar, and railtruck, took first in class, and each won a master award...
AND they took pictures for the magazines...

AND, I finally found the aircompressors for the tire truck and service truck, so I should be back there soon.
Have not worked on the tire truck or transporter in a while, will get back to them both this week hopefully...

Wednesday, July 22, 2009

Progress on the Louisville

And here is a shot of the detailed but unpainted engine....
Don't understand the system here, but for some reason when you post a new picture , it posts above , not below here is a full mock up...




Here is a shot of a mockup before paint....note the rear suspension from the ford snowplow kit










lingering projects....




These will be the first two lingering projects, to be worked on..
The racecar hauler progressed to present state in 1987....
the louisville is only about 4-5 years old.

progress on workbench..


Here are the paint boxes..right now they are sitting on a 1/4" tk plywood shelf. I made twelve boxes, but there is only room for ten. I'm thinking about adding a frame work, similar to a spice box, to seperate the boxes.....
The slots across the front are for labels...

Sunday, June 21, 2009

Rebuilding the model room



This is the view from the doorway to the model room.
Sa you can see there is a lot of stuff, and it is rather crowded.
Hopefully, we will be able to rearrange somewhat to get more room. Luckily, the big stuff is on wheels.


This is the cabinet on the work bench.
This has storage in the two doors, and shelves.
It is sitting on a cabinet, with storage...
There is a work surface, and two swing arm lamps, one with a magnifier.
The paint shelf is what started the thoughts of rebuild..It is a tier system, but everytime you take something down , others fall off..
Planning on replacing this with small boxes.




This is the paint booth cabinet.Actually only the top is the
Paint booth, the bottom part with the drwaers is a storage cabinet for paint and supplies.













Friday, June 12, 2009

New Blog.new posts

The first few entries here will be about the model room and equipment.
I will try to get some pictures up of my current setup, and some ideas of where that is going.
and then we will show some lingering projects, .....and eventually..build some trucks...